Test run – Toshiba MMK-AP0092H User Manual

Page 22

Advertising
background image

19

In case of wireless remote controller (Forced test operation is performed in a different way.)

REQUIREMENT

1. For the operation procedure, be sure to follow the Owner’s Manual.

2. Finish the forced cooling operation in a short time because it applies excessive strength to the air conditioner.

3. A test operation of forced heating is unavailable. Perform a test operation by heating operation using the

switches of the remote controller.

However heating operation may be not carried out according to the temperature conditions.

• Check wiring/piping of indoor and outdoor units

1. Open the front panel.

2. When pushing “TEMPORARY” button for 10 seconds or more, “Pi!” sound is heard and the operation changes

to a forced cooling operation. After approx. 3 minutes, a cooling operation starts forcedly.
Check cool air starts blowing. If the operation does not start, check wiring again.

3. To stop a test operation, push “TEMPORARY” button once again (Approx. 1 second).

The up/down air flow adjusting plate closes and the operation stops.

• Check transmission of remote controller

1. Push “START/STOP” button of the remote controller to check an operation can also start by the remote

controller.

• When pushing “TEMPORARY” button once (For 1 second), the operation changes to automatic operation.

For a forced cooling operation, keep the “TEMPORARY” button pushed over 10 seconds.

• “Cooling” operation by the remote controller may be unavailable according to the temperature conditions.

Check wiring/piping of the indoor and outdoor units in forced cooling operation.

TEMPORARY button

TEMPORARY button

11

TEST RUN