Priming – Taylor SLUSH 382 User Manual

Page 21

Advertising
background image

17

Models 382/RC25

Operating Procedures

Step 6

Place the control switch in the “OFF” position. Place an

empty mix pail beneath the door spout. Open the draw

valve and draw off all of the sanitizing solution. When

the sanitizer stops flowing from the door spout, close

the draw valve.

Figure 28

Step 7

Replace the hopper cover.

Figure 29

Priming

Step 1

Connect the mix delivery line to a container filled with

mix.

Step 2

Remove the prime plug.

Step 3

With a mix pail beneath the door spout, open the draw

valve. Place the fill switch in the “ON” position to allow

fresh product to flow into the freezing cylinder. This will

force out any remaining sanitizing solution. When full

strength product is flowing from the door spout, close

the draw valve. Allow the mix hopper to fill until the

product rises to the bleed port. Replace the prime plug.

Figure 30

Step 4

Place the control switch in the “AUTO” position. When

the unit cycles off, the product will be at serving

viscosity. The viscosity (thickness) of the slush can be

adjusted by turning the viscosity adjustment screw

under the control channel. Turn the viscosity

adjustment screw clockwise for a thicker product, or

counterclockwise for a thinner product. After making

an adjustment, allow the refrigeration system to cycle

2 or 3 times to accurately evaluate the viscosity.

Figure 31

Note: In order for the refrigeration system to operate,

the fill switch must be in the “ON” position while the

control switch is in the “AUTO” position.