Taylor SLUSH 382 User Manual

Page 8

Advertising
background image

4

To the Installer

Models 382/RC25

Step 5

Evacuate the field constructed refrigerant lines using

the access fittings brazed on the condensing end of the

refrigeration lines.
Step 6

When the evacuation process is complete, relieve the

vacuum with 4 oz. (113 g.) of HP62 refrigerant per line,

for a total of 8 oz. (227 g.) This procedure will prevent

moisture contamination during dispenser and

condensing unit connection and complete the total

charge.

Refrigeration Connections

Connect the refrigerant line quick connect/disconnect

couplings to the mating quick connect/disconnect

couplings on the dispensing and condensing unit.
Step 1

Remove the shipping caps from the quick

connect/disconnect coupling on the dispensing unit.
Step 2

Thoroughly clean and lubricate the mating surfaces of

the quick connect/disconnects.
Note: Use polyolester oil to lubricate the surfaces.
Step 3

Manually thread the coupling halves together to insure

proper mating of the threads.
Step 4

Using proper sized wrenches, tighten the coupling

halves until the round, flat surfaces of inner coupling

bodies completely depress one another.
Step 5

Once the flat surfaces are completely depressed,

tighten the couplings an additional 1/4 turn. This step

is necessary to insure that the knife edge of the seal

seats into the brass seat of the coupling halves,

forming a leak-proof joint (metal seal).

Figure 4

Step 6

Check all connections for leaks.

Step 7

Insulate all exposed suction line tubing and fittings.

Step 8

Set the pump down switch located in the condensing

unit. For indoor condensing unit application:
Set cut in at 30 PSIG (207 kPa).

Set cut out at 5 PSIG (34 kPa).
For outdoor condensing unit application:
Set cut in at 20 PSIG (138 kPa).

Set cut out at 0 PSIG (0 kPa).

Pump down pressure readings are to be taken at the

refrigeration line access fittings at the condensing unit.

Step 9

Allow the dispenser to run until the condensing unit

cycles off. Verify the proper pump down pressure

switch setting. See Step 8 of “Refrigeration

Connections” (page 4).

Note: Pump down pressure readings are to be taken

at the refrigeration line access fittings near the

condensing unit.

Step 10

If necessary, adjust viscosity to produce satisfactory

product. Adjustments are made by turning the

viscosity adjustment screw (located under the control
panel)

clockwise

for

a

thicker

product

or

counterclockwise for a thinner product.

Set Up Procedures

Standard Fill Module

Step 1

Connect the product supply line to the 1/4” barbed

fitting on the fill solenoid. Adjust the fill system

pressure to deliver product to the hopper at

approximately 15 to 20 PSIG (103-138 kPa).

Step 2

Lubricate, assemble, sanitize and prime the dispenser

as outlined in the Assembly section of this manual.

Step 3

Place the power switch in the “AUTO” position.

Note: The fill switch must be in the “ON” position to

enable refrigeration.

Advertising