Configuration and operation – Tripp Lite PDUMH15ATNET User Manual

Page 11

Advertising
background image

11

Quick Test
After installing the PDU and connecting
equipment, you may test the Automatic
Transfer Switch function by temporarily
shutting down the UPS system connected to the
Primary AC input. When the Primary input UPS
is no longer supplying AC power, the PDU will
switch from the Primary input to the Secondary
input, and the Secondary input LED will
illuminate. When the Primary input UPS has
been restarted and resumes supplying AC power,
the PDU will switch back to the Primary input.

Note: The primary and secondary inputs must be connected to
separate sources of utility power. The automatic transfer switch
function will be compromised if the primary and secondary
inputs are connected to the same utility power source. Do not
perform a test with equipment that must remain in productive
operation. Any test procedure must prepare for the contingency
that the equipment may lose power. Do not test the PDU by
detaching power cords which are connected to live power
sources, as this eliminates the connection to ground and places
your equipment at risk.

Primary Input Active

Secondary Input Active

Configuration and Operation

continued

Remote Monitoring and Control

The PDU provides remote monitoring , outlet
control

and more via Web browser, telnet

and SNMP-based Network Management
Systems. For more information about
configuration and operation of the PDU via the
PowerAlert Web browser interface, refer to the
SNMPWEBCARD User's Guide, included on
the CD-ROM bundled with the PDU.

B

A

A

B

200706234 93-2701 PDUMH15-20ATNET OM.qxd 7/11/2007 4:51 PM Page 11