34

NOTE Battery Aux and DC Shunt Trip wiring should be a minimum of 1.5 mm

2

.

Figure 3-10. Typical battery interface connection

3.5.3 X-Slot connections

NOTE

LAN and telephone drops for use with X-Slot cards must be provided by the customer.

NOTE

When installing internal wiring to X-Slot terminals, route the wiring through the internal
opening in the X-Slot communication bay.

For installation and setup of an X-Slot card, please contact Eaton Corporation.

To install wiring to connections:

1. If not already installed, install the LAN and telephone drops.

2. If not already accomplished, remove one top screw and two bottom screws securing the

UPS center front panel (see Figure 3-1). Lift the panel straight up to remove from the panel
hanger bracket at the top of the cabinet.

3. Remove the UPS cabinet interface entry plates to drill or punch holes (see Figure 3-3 on

page 26).

4. Reinstall the interface entry plates.

5. Route and install the LAN, telephone, and other cables to the appropriate X-Slot cards. See

Figure 3-7 and Figure 3-11 for X-Slot location.

6. When all wiring is complete, reinstall the front panels removed in previous steps and

secure with the retained hardware.

7. Refer to the manual supplied with the X-Slot card for operator instructions.