Test hook up no. 5 – Toro GREENSMASTER 3100 User Manual

Page 57

Advertising
background image

TEST HOOK UP NO. 5

(Greensmaster 3100)

Steering Pump Flow and Relief Pressure

TESTER CONNECTION:

Tester in series between steering pump outlet line and fitting on P (pressure) port of steering
control unit.

(Tester Flow Control Valve Open)

CAUTION: Keep everyone away from the front of the machine during steering
system tests.

TEST A: STEERING PUMP FLOW

PROCEDURE

Traction Lever in neutral.

Engine RPM 2800.

Hydraulic oil at operating temperature.

While watching flow and pressure gauges, slowly close flow control valve until 600 PSI
is obtained.

TESTER READINGS

Flow not lower than 1.5 GPM at 750 to 850 PSI

If flow is less than 1.5 GPM, check for restriction in pump intake line. If not restricted,
remove pump and repair as necessary.

If pressure not within listed range, remove steering relief cartridge and examine for
contamination or damage. Adjust steering relief valve if necessary.

TESTER

Greensmaster

®

3100

Page 4 - 35 Testing

GR3100 WITH DANFOSS PUMP SHOWN.

MACHINES WITH PARKER PUMP USE

LAST PUMP SECTION FOR STEERING

Rev. E

CIRCUIT.

Advertising