Installation instructions, Insulated stainless steel wall panels – Unified Brands TAKU Premier Ventilation User Manual

Page 10

Advertising
background image

Installation Instructions

Insulated Stainless Steel Wall Panels

PIECES PROVIDED

Insulated wall panel comes in two pieces.

A. Top panel will have a 1” flange full length top and bottom with interlocking

slots located on the bottom.

B. Bottom panel will have interlocking tabs on top and full length 1” flange on bottom.

INSULATED WALL PANEL

(See Fig. 10)









SINGLE THICKNESS

WALL PANEL

(See Fig. 11)

1. Install wall panels prior to hanging hood(s).

2. Install top panel first. Top of panel should be installed 6’-6” A.F.F. and level.

Screw panel to wall making sure slotted holes are facing floor.

3. Install lower panel by sliding tabs into slotted holes in upper panel, screw bottom
flange to wall.

4. Caulk horizontal seam with NSF approved silicone sealant.

5. When hood is hung it will rest on top panel.

NOTE: Be careful to not damage wall panel face when installing hood.

1. Install wall panels prior to hanging hood(s).

2. Install seam strips at proper locations and screw to wall.

3. Apply glue to wall between seam strips.

4. Slip one end of wall panel into seam strip, pull out middle of panel and slip other
end of panel into other seam strip. Gently apply pressure over entire wall panel to
secure to wall. Wall bands for side walls are provide with 1” return bend, which is

to be located behind rear wall panels.


Figure 10

Figure 11

END SEAM CAP

CENTER SEAM CAP

END SEAM CAP







78" A.F.F.

10

888-994-7636

Advertising