Vizio XMF1000 User Manual

Page 9

Advertising
background image

7. Push the bar through the openings in each bracket (

part A) as

shown.

Snap on the leveler (

part E) and verify that the bar is level.

Make any small adjustments, then use a wrench to tighten the 2
lag bolts completely.

8. Using the power drill and the 7/32” drill bit, drill into the top 2
holes as shown.

Ensure you are drilling into the stud. Drill

the hole about 2” into the stud.

7

Level Bar

Tighten Bolts

8

7/32”

7

The bar can be inserted from right to left or left to right,
depending on the end of the bar to which you would like
the handle attached.

Advertising