Pre-installation preparation, Framing, Clearances – Vanguard Heating VDVF36PP User Manual

Page 4: Mantel clearances

Advertising
background image

4

105706

DIRECT-VENT GAS FIREPLACE HEATER

VDVF36P and VDVF36ST Series

®

FRAMING

Once the final location has been determined,
observing height clearances for vent termi-
nation, you may construct framing using
dimensions shown in Figures 7 through 9,
page 5, depending on your installation.

If the appliance is to be installed directly on
carpeting, tile (other than ceramic), or any
combustible material other than wood floor-
ing, the appliance must be installed on a
metal or wood panel extending the full width
and depth of the appliance. There are three
holes on each side of the bottom of the unit
where screws can be used to secure the unit
to the floor.

CLEARANCES

Minimum clearances to combustibles are:

• Back and Sides

of Surround: ............................. 0" min.

• Vent Surfaces: ............ 1" (2.5cm) min.

• Ceiling to Opening: ... 36" (91cm) min.

• Floor: ........................................ 0" min.

• Wall to Front of Glass:36" (91cm) min.

• Perpendicular Wall to

Opening of Unit: ........... 2" (5cm) min.

• Top Spacer: .............................. 0" min.

Figure 4 - Minimum Clearances (Peninsula Shown)

Figure 5 - Minimum Clearances (See Thru Shown)

CAUTION: Do not block re-

quired air spaces with insula-
tion or any other material. Do not
obstruct the effective opening of
the appliance with any type of
facing material.

MANTEL CLEARANCES

Woodwork, such as wood trims, mantles,
and other combustible materials projecting
no more than 1

1

/

2

inches (3.8cm) shall not

be placed within 7 inches (17.8cm) from the
opening of the unit. Combustible material
above and projecting more than 1

1

/

2

inches

(3.8cm) from the appliance’s face must not
be placed less than 15 inches (38.1cm) from
the opening of the appliance (see Figure 6).

Figure 6 - Mantel Clearances for Peninsula
and See Thru Fireplaces (Peninsula
Shown)

PRE-INSTALLATION
PREPARATION

CEILING

WALL

36"

(914mm)

Min.

36"

(914mm)

Min.

0" Floor

12"

(305mm)

Min.

21"

(533mm)

Min.

15"

(381mm)

Min.

4"

(102mm)

Min.

7" (178mm)
Min.

1

1

/

2

" (38mm)

Min.

UNIT

Spacer

2 x 4

Combustible
Material May
Be Used

Drywall (Gypsum
Board, Sheetrock, Etc.)

Safe Zone for
Projection of
Combustible
Material

0"

36"

(914mm)

2" (51mm)

Wall In Front Of Glass

36" (91cm) Min.

Perpendicular
Wall 2" (51mm)
Min. From Opening

Right Side
Surround
(0" Min.)

Left Side
Surround
(0" Min.)

TOP VIEW

Combustible
Material

Drywall

2 x 4 Stud

Minimum 1"
Clearance from Side
(Only for See Thru)

Advertising
This manual is related to the following products: