Owner’s manual, General venting, Pre-installation preparation – Vanguard Heating VDVF36PP User Manual

Page 5: Continued, Location of vent termination

Advertising
background image

5

105706

OWNER’S MANUAL

Figure 7 - Rough Opening for Installing
Peninsula Fireplace

39

3

/

4

"

(1010mm)

Min.

40

1

/

2

"

(1029mm)

23

5

/

8

"

(600mm)

39

3

/

4

"

(1010mm)

Min.

40

1

/

2

"

(1029mm)

23

5

/

8

"

(600mm)

*

Figure 8 - Rough Opening for Installing
Peninsula Fireplace on Platform

* As required by design as long as ceiling
clearance is maintained.

Platform Must Be
Solid, Flat, and
Fully Supported

39

3

/

4

"

(1010mm)

Min.

43

1

/4"

(1098mm)

23

5

/

8

"

(600mm)

Figure 9 - Rough Opening for Installing
See Thru Fireplace

3" (76mm)

1" (25mm)

Dia. Hole

3"

(76mm)

2" (51mm)

Dia. Hole

1"

(25mm)

2"

(51mm)

Height

Depends On

Installation

10"

(254mm)

Square Min.

Figure 10 - Hole Locations For Gas Line
and Electric Wires for Peninsula and See
Thru Fireplaces

Figure 11 - Rough Opening for Installing
Exterior Vent Terminal

These models are approved for use with
Simpson Dura-Vent 6

5

/

8

" direct-vent pipe

components and terminations as well as both
flex and rigid Vanguard vent components.

Your fireplace is approved to be vented either
through the side wall, or vertically using the
following guidelines:

• Only use Vanguard or Simpson Dura-

Vent GS venting components or kits spe-
cifically approved for this fireplace.

• Minimum clearance between vent pipes

and combustible materials is 1" (25 mm),
except where stated otherwise.

• Combustible material may be flush with

the top front of fireplace with a maxi-
mum thickness of 3/4".

• Do not recess venting terminals into a

wall or siding.

• Install horizontal venting with a 1/4"

rise for every 12" of run toward the ter-
mination.

• You may paint the vent terminal with

450

°

F (232

°

C) heat-resistant paint to co-

ordinate with the exterior finish.

• There must not be any obstruction such

as bushes, garden sheds, fences, decks,
or utility buildings within 24" from the
front of the termination cap.

• Do not locate termination cap where ex-

cessive snow or ice build up may occur.
Be sure to clear vent termination area af-
ter snow falls to prevent accidental block-
age of venting system. When using snow
blowers, do not direct snow towards vent
termination area.

LOCATION OF VENT
TERMINATION

When locating vent termination, it is impor-
tant to observe the minimum clearances
shown in Figure 13, page 6. You will avoid
extra framing by positioning your fireplace
against an already existing framing mem-
ber. The sides of the fireplace may be posi-
tioned directly against combustible walls.

*Check with local codes or with the current
CAN/CGA B149[.1 or .2] Installation Codes
for Canada or the USA Installations follow
the current National Fuel Gas Code, ANS
Z223.1
, also known as NFPA 54.

GENERAL VENTING

Vertical Height

Depends on

Installation

26

3

/

8

"

(670mm)

Horizontal

Length Depends

on Installation

90

o

Elbow

45

o

Elbow

PRE-INSTALLATION
PREPARATION

Continued

Refer to Pages
8 through 14
for Horizontal
and Vertical
Installation
Details

Figure 12 - Vent Opening Height

Continued

Advertising
This manual is related to the following products: