Machine operation – Windsor VOYDU1 User Manual

Page 24

Advertising
background image

MACHINE OPERATION

86292490 VOYAGER DUO 08/20/07

4-1


SERVICE SCHEDULE

MAINTENANCE

BEFORE EACH
WORK PERIOD

AFTER EACH

WORK

PERIOD

50

HRS

100

HRS

200

HRS

Check water level of batteries after charging;
add distilled water if necessary.

*

Check brushes for proper installation.

*

Check for securely attached drain hose, plug
and cap.

Check that solution fill lid seals tightly

*

Visually check for damaged or worn tires.

*

Check all throttle, direction and speed controls
for proper operation.

*

Observe spray pattern and clean jets if
necessary.

*

Prime chemical system for 30 seconds for
each chemical.

*

Clean brushes and check wear.

*

Clean underside of scrub deck.

*

Clean out solution tank.

*

Clean out recovery tank.

*

Clean and inspect solution filter strainer.

*

Store with solution fill lid and recovery dome
off tanks to allow tanks to dry.

*

Clean outside of tank, check for damage.

*

Flush chemical system

*

Charge batteries.

*

Clean off top of batteries.

*

Check battery cells with hydrometer.

*

Check battery connections are tight.

*

Clean battery cases and battery compartment.

*

Grease appropriate zerks (grease fittings).

*

Clean pivot points on scrub deck.

*

Check all motors for carbon brush wear.

*

Check motor commutators.

*



Advertising
This manual is related to the following products: