Weider Pro 4850 831.153932 User Manual

Page 13

Advertising
background image

13

24.

Remove the preattached 90mm Pulleys (78)
from the Offset Double “U”-bracket (61).

Wrap the Swivel Cable (17) around a 90mm Pulley
(78). Attach the Pulley to the Offset Double “U”-
bracket (61) with an M10 x 45mm Bolt (93) and an
M10 Nylon Locknut (87).

25. Wrap the Swivel Cable (17) around a 90mm Pulley

(78). Attach the Pulley and a Cable Trap (68) to the
next to bottom hole in the Small Pulley Plates (31)
with an M10 x 50mm Bolt (100) and an M10 Nylon
Locknut (87).

Make sure the Cable Trap is turned

to hold the Cable in the groove of the Pulley.

26. Wrap the Swivel Cable (17) around a 90mm Pulley

(78). Attach the Pulley and a long Cable Trap (102)
to the bracket on the Swivel Upright (5) with an
M10 x 50mm Bolt (100) and an M10 Nylon Locknut
(87).

Make sure the Cable Trap is turned to hold

the Cable in the groove of the Pulley.

27. Attach the end of the Swivel Cable (17) to the

bracket on the Swivel Carriage (46) with an M10 x
20mm Bolt (13) and an M10 Nylon Locknut (87).

28.

Locate the Lat Cable (88), which is 2310mm long
and has a ball on one end and an eyelet on the
other.
Route the eyelet end of the Cable up through
the Butterfly Top Frame (7) and around a 90mm
Pulley (78). Attach the Pulley inside of the Butterfly
Top Frame with an M10 x 67mm Bolt (121), two M10
Washers (91), two 12.5 Spacers (89), and an M10
Nylon Locknut (87).

28

24

25

26

27

78

87

93

17

61

100

78

17

78

68

46

87

17

13

17

87

102

121

87

88

91

91

89

89

7

78

31

87

100

5

Advertising