Building in, Fitting the hob into the worktop, Building over a cupboard or drawer – Zanussi ZGF 782 User Manual

Page 13: Building over a kitchen unit with door

Advertising
background image

13

ON/OFF SWITCH

FLEX
OUTLET

ON/OFF SWITCH

FLEX
OUTLET

FO 0763

FO 0764

30

20 min

60

a

b

FO 1013

1

2

3

50

50

FO 2039

FO 0199

a

Fitting the Hob into the worktop

Carry out the building in of the hob as follows:

• put the seals supplied with the hob, on the

edges of the cut out: place them exactly on

the front and rear edge and at 50 mm. from

the side edges, as shown in the diagram, taking

care that the seals meet without overlapping;

• place the hob in the cut out, taking care that it

is centred;

• fix the hob with the relevant fixing clamps

and screws, as shown in the diagram. When

the screws have been tightened, the excess

seal can be removed.

The edge of the hob forms a double seal which

prevents the ingress of liquids.

Dimensions are given in mm.

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or

drawer it will be necessary to fit a heat resistant

board below the base of the hob on the underside of

the work surface.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the

furniture unit, in order to avoid any contact with the

bottom of the hob which can be heated when it is

operated. The recommended solution is shown in

diagram 3.

The panel fitted under the hob ("a") should be easily

removable to allow easy access if technical assistance

is needed. The space behind the kitchen unit ("b") can

be used for connections.

It is also recommended to carry out the electrical

connection to the hob as shown in diagrams 1 and 2.

Seal

F

Advertising