Caution: risk of equipment damage – Xantrex Technology Solar 400 User Manual

Page 34

Advertising
background image

Operation

18

975-0328-01-01

To recharge with a solar panel:

1. Connect the solar panel to the unit.

2. Place the solar panel in direct sunlight.

It takes about 45 hours in direct sunlight to recharge the
Powerpack Solar 400 from the 5 W solar panel.

The indicator light located on the solar panel flashes
intermittently when the panel receives power from
sunlight. The control panel digital display and AC
charging indicator lights do not come on when charging
with the solar panel.

Figure 3-4 Charging with the Solar Panel

Note

:

You have the option to detach the solar panel from the unit

or you can leave the solar panel attached while choosing a
location and repositioning the unit to face direct sunlight.

CAUTION: Risk of Equipment Damage

Use only the supplied solar panel. Connecting an after-market or
third-party solar panel to use for recharging the internal battery may
damage the unit and void the warranty.

solar panel
Indicator light

Advertising