4.1 Introduction

This section outlines the sequence for installing the PSE2500-A3

device, including plug-in modules, as well as test procedures for

verifying the integrity of the installation.

4.1.1 Guidelines

The device may be installed to allow rear and front access. All

cables may be routed through conduit openings, and all the operation

can be completed on the front side.

4.1.2 EMI Considerations

When running the dc output cables, pair the positive and negative

conductors over as much of their length as possible to minimize loop

areas.

4.1.3 Installation Tools and Hardware

You will need the following tools and hardware to install and test

the PSE2500-A3 unit:

z

Wire cutters and strippers

z

Heat shrink gun and appropriately sized heat-shrink tubing

z

Electric screwdriver with 6 mm (0.24 in.) hex head with

variable torque range, 0 to 120 in lbs (0 to 13.6 N.m)

z

Adjustable wrench

z

M8 sleeve