4 safety, 5 installation sequence, 4 safety -2 – 3Com External PoE Power System PSE2500-A3 User Manual

Page 23: 5 installation sequence -2

Advertising
background image

User Manual
PSE2500-A3 External PoE
Power System

Chapter 4 Installation and

Debugging

4-2

z

Digital meter with an accuracy of ± 0.02%

z

Small flat screw driver

z

ESD wrist strap

4.1.4 Safety

Warning:

z

Only qualified personnel can install and service the PSE2500-A3

device.

z

Hazardous energy is present in the device and on the interface

cables, and ill shock or cause serious injury or death if safety

precautions are ignored. Follow all safety warnings and practices

when servicing this equipment.

4.1.5 Installation Sequence

Review all safety warnings in Section 3 before beginning the

installation process. Observe all warnings and labels on the

equipment.

The PSE2500-A3 system consists of a chassis in which includes

AC and DC distribution modules, one system controller, and one

rectifier bracket. Refer to Figures 2-6 and figure 2-7 for relationship of

components.

Advertising