Optional: install the open racks – 8e6 Technologies ProxyBlocker MSA-004-005 User Manual

Page 15

Advertising
background image

8

e

6 P

roxy

B

locker

Q

uick

S

tart

G

uide



Optional: Install the Open Racks

After you have installed the inner rails on the chassis, you are ready to install the outer

rails of rail assemblies to the rack.

NOTE: The rails are designed to fit in the racks with the depth of 28” to 33”.

Determine the placement of each component in the rack before you install the

rails.

• Install the heaviest server components on the bottom of the rack first, and

then work up.

1. In the package, locate a pair of front (short) and rear (long) brackets. Please note

that the brackets are marked with Up/Front Arrows (front) and Up/Rear arrows (rear).

2. Secure the front (short) bracket (marked with the Up/Front arrows) to the outer rail

with two Type G screws as shown below.

Advertising