Installation and configuration, Unpacking the system, Installing the tooled rail solution – Dell PowerEdge C6100 User Manual

Page 5

Advertising
background image

Getting Started With Your System

3

CAUTION:

Restricted Access Location

This server is intended for installation only in restricted access locations
as defined in Cl. 1.2.7.3 of IEC 60950-1: 2001 where both these
conditions apply:

Access can only be gained by

service persons or by users who have been

instructed about the reasons for the restrictions applied to the location
and about any precautions that shall be taken.

Access is through the use of a

tool or lock and key, or other means of

security, and is controlled by the authority responsible for the location.

Installation and Configuration

WARNING:

Before performing the following procedure, review and follow

the safety instructions that came with the system.

Unpacking the System

Unpack your system and identify each item.

Installing the Tooled Rail Solution

WARNING:

Whenever you need to lift the system, get others to assist you.

To avoid injury, do not attempt to lift the system by yourself.

WARNING:

The system is not fixed to the rack or mounted on the rails.

To avoid personal injury or damage to the system, you must adequately support
the system during installation and removal.

WARNING:

To avoid a potential electrical shock hazard, a third wire safety

grounding conductor is necessary for the rack installation. The rack equipment
must provide sufficient airflow to the system to maintain proper cooling.

Advertising