Placing name label, System wiring and connections, Basic one-to-one connection – V-Tech DT597 Manual User Manual

Page 5

Advertising
background image

Placing Name Label

90°

Open

Close

1

2

3

System Wiring and Connections

L1 L2 PL S1+ S2+ S-

-

+

monitor

AC~

PC6

Basic one-to-one Connection

Steps:

1. Use the special spanner to move 90

0

to loosen the screw.

2. Open the front panel.

3. Insert the name plate

-5-

Advertising