5 switch on phase – VEGA VEGABAR 52 - climate compensated User Manual
Page 20
Advertising
I2C
1
1
2
Fig. 12: Wiring plan, double chamber housing
1
Voltage supply/Signal output
5.5 Switch on phase
A
fter connecting VEGABAR 52 to power supply or after a voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds:
l
I
nternal check of the electronics
l
I
ndication of the instrument type, the firmware as well as the
sensor TAGs (sensor designation)
l
O
utput signal jumps briefly (approx. 10 seconds) to the set fault
current
T
hen the corresponding current is outputted to the cable (the value
corresponds to the actual level as well as the settings already carried
out, e.g. factory setting).
Wiring plan
Switch on phase
20
VEGABAR
52 • 4 … 20
mA/HART - climate compensated
5 C
onnecting to power supply
35075
-EN
-081209
Advertising