4 Mounting

VEGAPULS 62 • Modbus and Levelmaster protocol

41362-EN-121011

0%

100%

1
2
3

1

2

3

4

5

8

6

7

9

Fig. 20: Configuration surge pipe
1 Radar sensor

2 Marking of the polarisation plane

3 Thread or flange on the instrument

4 Vent hole

5 Holes

6 Weld joint

7 Welding neck flange

8 Ball valve with complete opening

9 Fastening of the surge pipe

Instructions for orientation:

•

Note marking of the polarisation plane on the sensor

•

With threaded fitting, the marking is on the hexagon, with flange

connection between the two flange holes

•

The marking must show to the direction of the holes in the surge

pipe

Instructions for the measurement:

•

The 100 % point must be below the upper vent hole and the

antenna edge

•

The 0 % point is the end of the surge pipe

•

For the parameter adjustment, select "Application standpipe" and

enter the tube diameter to compensate errors due to running time

shift

•

A false signal suppression with integrated sensor is recommended

but not mandatory

•

The measurement through a ball valve with complete run is pos-

sible