Expansion port mounting – VEGA LUCOM EDGE router ER75i v2 SL USER’S GUIDE User Manual

Page 26

Advertising
background image

EXPANSION PORT MOUNTING

26

•

for single cables we recommend to bind the bunch according to the following picture,
for this use we recommend:

length of the bunch (combination of power supply and data cables) can
be maximum 1,5 m, if the length of data cables exceeds 1,5 m
or in the event of, the cable leads towards the switch - board, we
recommend installing over - voltage protectors (surge suppressors),

with data cables they mustn't carry cables with reticular tension
~ 230 V/50 Hz,

all signals to sensors must be twisted pairs.

•

sufficient space must be left before individual connectors for handling of cables,

•

for correct function of the modem we recommend to use in the switch-board earth-

bonding distribution frame for grounding of power supply of modem, data cables
and antenna,



























































LUCOM GmbH * Ansbacher Str. 2a * 90513 Zirndorf * Tel. 09127/59 460-10 * Fax. 09127/59 460-20 * www.lucom.de

Advertising