Atdec Telehook TH-VA-2X2-SHARPV6012 Installation manual User Manual

Page 3

Advertising
background image

Rev.01-08/11

Figure 5

Step 3: Install upper stand-off buttons to monitors
Thread two standoff-buttons (black) into the top VESA
mounting holes in the back of each monitor using the
included M6 flat head screws

(Figure 4).

Step 4: Install lower stand-off buttons to monitors
Thread two standoff-buttons (black) into the bottom
mounting holes in the back of each monitor .Tighten
permanently (Figure 4).

Important: If the pitch of the monitor needs to be
adjusted, add nylon spacers between the top (or bottom)
stand-off buttons and the monitor.

Step 5: Install Left Column Monitors
Starting with the upper left monitor, connect power and
signal wires to each monitor then align its four stand-off
buttons with the four large holes of the slots in the
horizontal channels. Lift up locking arms then slide the
monitor from left to right until it stops then pull down the
locking arm to lock into place (Figure 5). Repeat step 5
for the lower monitors.

Note on alignment:
While installing monitors, check for front and side
alignment of the monitors. The surfaces of all monitors
must be aligned and flush to each other. If one or more
screens are tilted more than
others, remove the screen(s) and,
depending whether the monitor
needs to be tilted forward or
backward, apply additional nylon
washers as necessary between
the monitor and its machined
fittings buttons (Figure 4).
Reinstall and recheck surface
alignments. Repeat where
necessary.

Step 6: Install Right Column

Monitors
Starting with the upper right
monitor, connect power and signal
wires to each monitor then align its
four stand-off buttons with the four
large slots in the horizontal
channels. Lift up locking arms then
slide the monitor from right to left
until it stops then pull down the
locking arm to lock into place

(Figure 7). Repeat step 6 for the
lower monitors. Check for front
and side alignments.

Figure 4

Advertising