Banks Power Ford Trucks: (Gas ’04 - 08 F-150 V6 & V8) Exhaust- Monster Exhaust, Dual out the back exit '04-10 F-150 4.2L, 4.6L & 5.4L (Non-Heritage models) User Manual

Page 8

Advertising
background image

8

96317 v.5.0

system, the factory muffler front

rubber hanger will be removed for Std.

Cab Medium (6.5’) Bed and Ext. Cab

Short (5.5’) Bed models. remove the

factory M8x1.25 bolt on the rubber

muffler hanger, and remove the rubber

hanger from the vehicle (see Figure 3).

7.

FOR 2009-2010 SuPERCREw CAB

MODELS ONLY, Install a 2

1

2

” clamp

onto the outlet of the factory pipe.

Install the Banks intermediate pipe into

the factory intermediate pipe outlet.

Lightly tighten the 2

1

2

” clamp.

FOR ALL OTHER MODELS, Install a

2

1

2

” clamp onto the inlet of the Banks

intermediate pipe. Install the Banks

intermediate pipe onto the factory

Y-pipe outlet. orient the pipe onto

the locating pin and lightly tighten the

2

1

2

” clamp (see Figure 4).

8.

FOR 2009-2010 SuPERCREw CAB

MODELS ONLY, install the 3” hanger

clamp onto the muffler inlet. The

Hanger pin should face the front of the

vehicle. Install the hanger pin into the

corresponding hanger. Install Banks

Muffler inlet onto the intermediate

pipe and lightly tighten the 3” hanger

clamp.
FOR ALL OTHER MODELS, install a 3”

clamp onto the muffler inlet. Install

the Banks Muffler inlet (Note the

inlet labeling of the muffler) onto the

intermediate pipe and lightly tighten

the 3” clamp.

9.

Install a 3” clamp on the Banks

Muffler outlet. Start the Y-pipe hanger

pin into the corresponding vehicle

rubber hanger. Install Y-pipe into the

Banks Muffler outlet (see Figure 5).
NOTE: Install the rubber hanger pins to

the vehicle frame if previously removed.

10.

FOR TRuCK MODELS wITH

STANDARD TOw HITCH PACKAgE,

on

the left inside of the bumper, remove

the two (2) bumper upper retaining

nuts from the studs. Install the Left

Banks hanger bracket such that it is

parallel with the ground. reinstall the

two (2) factory bumper nuts over the

bracket and torque to 85 ft-lbs. repeat

this process for mounting the right

hanger bracket. See Figure 6.
FOR TRuCK MODELS wITH HEAvY

DuTY TOw HITCH PACKAgE ONLY,

Install the supplied hanger bracket on

the rear driver-side frame rail using the

supplied hardware. Be sure the hanger

pin is align parallel to the frame rail

and torque the hardware to 48ft-lbs.

repeat this process for mounting the

right hanger bracket. See Figure 7.

11.

Install the two (2) supplied rubber

hangers onto the two (2) Banks hanger

brackets.

12.

Install a 3” clamp onto each

Y-pipe outlet. Install the driver-side

tailpipe into the top Y-pipe outlet and

hand tighten the clamp.

13.

Install the passenger-side tailpipe

into the lower Y-pipe outlet and hand

tighten the clamp.

14.

Install the 3” band clamp onto

the outlet of the Left tailpipe and

install the left tailpipe tip onto the left

tailpipe. Install the driver-side tailpipe

tip hanger into the rear rubber hanger.

Keep the wrapping on until installation

is complete. The tip and the clamp

should be rotated so the clamp nut

and drain hole are pointing down.

repeat this process for the right side

tailpipe tip installation. See Figure 7.

15.

Be sure that the two (2) tailpipes

are completely engaged into the Y-pipe.

adjust your tailpipes so that the tips

are symmetrical and 1” below the rear

bumper. The hanger pins should be

parallel with the frame-mounted pin and

the rear rubber hangers are all slightly

positioned forward (See Figure 8).
NOTE: Recommended distance

between exhaust tip and body is

1

2

-inch to 1-inch.

Advertising