General installation practices, Attention, Tools required – Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) Tuner- Big Hoss Diesel Tuner (does not connect to pump wire) User Manual

Page 6: Recommended airflow improvements

Advertising
background image

6

96766 v.8.0

Dear Customer,
If you have any questions

concerning the installation of

your Banks Big Hoss Diesel Tuner,

please call our Technical Service

Hotline at
(888) 839-2700 between 7:00 am

and 5:00 pm (PT). If you have any

questions relating to shipping

or billing, please contact our

Customer Service Department at

(888) 839-5600.
Thank you.

1.

For ease of installation of your

Banks Big Hoss Diesel Tuner, familiarize

yourself with the procedure by reading

the entire manual before starting work.

This instruction manual contains 16

pages of text and illustrations.

2.

Throughout this manual, the left side

of the vehicle refers to the driver’s side,

and the right side to the passenger’s

side.

3.

Disconnect the ground cable from the

battery before beginning work. If there

are two batteries, disconnect both.

4.

Route and tie wires and hoses

a minimum of 6 inches away from

exhaust heat, moving parts and sharp

edges. clearance of 8 inches or more is

recommended where possible.

5.

The installation should be performed

at a time when the vehicle has been

allowed to completely cool. This

installation requires the installer to work

near surfaces that may remain hot after

the vehicle has been run. Failure to

allow the vehicle to cool may result in

personal injury.

6.

During installation, keep your work

area and components clean.

Tools Required:

These tools are necessary for

installation:
• Standard and Phillips head

screwdrivers
• Standard and needle-nose pliers
• Pocket or X-Acto knife
• Clean shop towels or rags

Recommended airflow

improvements:

1. Banks Monster

®

Exhaust

Standard cab . . . . . . . . . . . . . 48635

Extended Cab. . . . . . . . . . . . . 48636

2. Banks BigHead

®

Actuator . . . . . . . . . .

1998 ISB . . . . . . . . . . . . . . . . . 24328

1999-2000 ISB . . . . . . . . . . . . 24329

2001-2002 ISB 245 HP . . . . . . 24329

3. Banks Ram-Air

®

Filter . . . . . . . . . . . . . . . . . . . . 41027

Service Kit. . . . . . . . . . . . . . . . 90094

4. Gauge Assembly

Boost and Pyro. . . . . . . . . . . . 64505

5. Thermocouple. . . . . . . . . . . . . . . 63042

6. Lead wire. . . . . . . . . . . . . . . . . . . 63060

7. Turbine Inlet Gasket. . . . . . . . 93027

Attention!

Before proceeding with these

instructions, please carefully read

the DISCLAIMER OF LIABILITY

and LIMITATION OF WARRANTY

statement located on page

4

of this

manual.

General Installation Practices

Advertising