Banks Power Chevy_GMC Trucks: Duramax LB7 (Diesel ’01 - 04 6.6L) Tuner- Six-Gun Diesel Tuner w_ optional Speed-Loader Module (LB7 & LLY) '01-05 (iQ) Compatible with Optional Banks iQ User Manual

Page 17

Advertising
background image

96815 v.3.0

17

9.

Locate Banks iQ Bridge Module and

connect the RJ12 connector into the

Bridge Module. See Figure 9.

10.

Route the Banks iQ USB interface

cable from the Banks iQ Bridge Module

under the dash and out through the

fuse access panel opening. The cable

can be slid under the door frame’s

seal and run up to the top of the dash.

Pull enough cable to reach the Banks

iQ and connect it to the left receptacle

on the iQ. See Figure 6. Snap the fuse

access panel back in place making

sure not to pinch the wire.
WARNING: THE CHARGING CABLE

CONNECTED TO THE BANKS iQ IS

DESIGNED TO SUPPLY A CONSTANT

LOW-VOLTAGE POWER SOURCE

(+5VDC) TO THE BANKS iQ AND IS

“LIVE” AS LONG AS THE SYSTEM’S

OBD II INTERFACE CABLE OR BANKS

WIRING HARNESS IS COMPLETELY

INSTALLED AND THE USB CABLE

CONNECTOR IS PLUGGED INTO

BANKS iQ. ALTHOUGH THIS

CHARGING CABLE IS SHORT AND

ITS CIRCUITRY IS FUSE-PROTECTED,

THE USER IS ExPECTED TO TAKE

APPROPRIATE MEASURES TO

PREVENT SMALL CHILDREN AND/

OR PETS FROM CONTACT WITH ANY

PART OF THIS SYSTEM.

11.

Secure Banks iQ Bridge Module

under the dash to any dash frame

support using the supplied cable ties.

Use the cable tie support loops on the

side of the Bridge Module to securely

fasten it under the dash.

12.

Route all wiring away from any

pedals or other moving components.

Using the cable ties supplied, secure

the wiring under the dash.

-END, SEcTION 2-

Figure 9 Banks Bridge Module

Advertising