Installation procedure – Banks Power Chevy_GMC Trucks: Diesel ’82 - 93 6.2L Forced Induction- Sidewinder Turbo System (early-body) User Manual

Page 6

Advertising
background image

INSTALLATION pROCEDURE

disconnect ground cables from both batteries.
Remove the air filter, housing, intake silencer

and flexible duct, and bracket from the exhaust

manifold. cover the intake manifold opening with a

clean rag to prevent foreign objects from entering the

intake manifold.

adjust the injector pump. Refer to the InJecTIOn

puMp adJusTMenT section. When the pump

adjustment is completed, make sure that the ground

cables from both batteries are disconnected, then

continue with the following steps.

1982–1987 mOdELS

Remove two crankcase vent tube assemblies

from the intake manifold vent nipples. Install two

3

4

I.d. caps on the nipples and retain with spring clamps.

See Figure

2.

1988 ANd NEWER mOdELS

A. Remove anti-depression valve (cdR) and hose from

right hand valve cover and intake manifold. save valve

and hose for re-installation.

B. Install 1” dia. rubber cap over fitting on intake

manifold where hose was removed. use a no. 16 hose

clamp, provided, to secure the cap.

Remove and discard air inlet gasket from the

intake manifold. Remove air filter mounting

studs. Install two new pressure chamber studs with

two

5

16

” thick spacers between studs and intake

manifold.
nOTe: On light-duty engines which employ an e.g.R.

valve, a light-duty e.g.R. valve application Kit, Banks

p.n. 21056, will be required for e.g.R. valve hook-up.

On these engines, do not install

5

16

” spacers, but refer

to instructions included in application Kit.

Install new air inlet gasket provided on the intake

manifold. Install pressure chamber over studs,

secure with two sealing washers,

5

16

” I.d. x

3

4

” O.d. flat

washers and

5

16

” – 24 locknuts. slip a piece of blue 2

1

2

I.d. x 2

3

8

” silicone hose on the air inlet nipple. Install a

1

8

” npT pipe plug in the left rear corner of the pressure

chamber if optional boost gauge is not to be installed.

See Figure

2.

Raise the vehicle and support it on jack stands.

disconnect and remove exhaust pipes, mufflers

and tailpipes. Remove and retain one exhaust pipe

“doughnut” gasket. If neither doughnut gasket is in

reusable condition, replacements may be ordered from

gM, part #14037813. saw off the flared (manifold) end

of the right exhaust pipe. Remove and retain the 3-bolt

flange for future use.

disconnect fuel lines from the fuel lift pump

(right front corner of engine block).

Remove fuel lift pump from engine.

Remove the adapter plate from engine block. do

not let fuel pump rod fall out.

If fuel pump rod wants to fall out, coat it with a

heavy grease, such as chassis or wheel bearing

grease, to help keep it in place in the engine block.

clean gasket surfaces on engine block and fuel

pump mounting flange.

Install new adapter/drain plate to engine block

using original bolts and new gaskets supplied.

use silicone sealer on the gasket surfaces.

Re-install fuel pump to adapter plate with

original bolts and new gaskets supplied. use

silicone sealer on the gasket surfaces.

Re-attach fuel lines to the fuel pump.

Lower the vehicle.

disconnect the glow plug wires and remove the

glow plugs.

Remove the right (passenger side) exhaust

manifold from engine. Retain all mounting bolts.

clean the cylinder head mounting surface.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

6

figure 2

p.n. 96291 v.3.0

Advertising