Banks Power Cummins Motorhomes: (Diesel ’98 - 03 ISB 5.9L) PowerPack TLC & Stinger TLC systems w_OttoMind Module 5.9L, Class-A MHExcept Comon Rail User Manual

Page 5

Advertising
background image

provided.

For Stinger installation, proceed to Step 26.

HIGH-RAM INSTALLATION

Disconnect the hose joint at the inlet end of

the factory intake casting. Remove the four

bolts that mount the inlet casting to the intake

manifold and remove the factory casting.

Remove the front inboard bolt from the

base plate of the intake manifold. Loosen

the nut on the ground strap for the intake heater

element and rotate the cable around so that the

ring terminal can be reinstalled under the head

of the intake bolt. Important: do not allow the

terminal on the element end of the ground cable

to come in contact with the upper heater lug or

with the injector line. Retighten the retaining nut

and reinstall the front intake manifold bolt through

the ring terminal. (See

Figure 3.

) NOTE: Your

installation may be simplified by proceeding to
the OttoMind installation at this point. complete
steps

26-31

and then return to this location in the

instructions.

Thread the four studs provided into the

intake casting, placing the shorter studs on

the inboard side. Note: The end of the stud with

the coarse thread goes into the intake manifold.

Use Loctite sparingly on the threads. Using the

two

5

16

”-24 nuts provided, tighten the studs into

the casting by threading both nuts onto each

stud, tightening the nuts against each other using

two

1

2

” open end wrenches, and then tightening

the stud by turning the wrench on the top nut.

See

Figure 4

. Reverse the process and remove

the nuts from the stud and then repeat on each

remaining stud. NOTE: On some models the
air conditioner lines run over top of the intake
manifold. In this case the gaskets, heater casting,
and High-Ram will need to be in place before
installing the studs.

Slide the intake gasket provided over the

studs and set the High-Ram in place on

the studs. Twist a Stat-o-seal washer over each

stud followed by a flat

5

16

” AN washer. Install a

5

16

”-24 nylock nut on each stud and torque the

nylocks to 10 ft-lbs (120 in-lbs). Caution: do not

overtighten!

Remove the factory boost tube from the

intercooler outlet. Install the boost tube

provided using the factory hose joint at the inlet

end and the hump hose provided on the outlet

end. Reuse the factory clamps on the outlet end.
NOTE: Some models may require replacement
of the air compressor inlet hose with a longer
section to allow for installation of the High-Ram
casting. A length of hose has been provided for
this purpose. In addition, some models may have
interference between the High-Ram installation
and a metal support rod extending from the
radiator to a frame mount. It may be necessary
to adjust or slightly modify this rod.

OTTOMIND INSTALLATION

Locate the two black wire sheaths covering

four black wires at the top back portion of

the fuel injection pump. See

Figure 5.

Caution:

It is very important that you select the proper

23.

21.

22.

24.

25.

26.

Figure 3

P.N. 96398

5

Advertising