Monster exhaust system installation – Banks Power Chevy_GMC Trucks: Gas ’99 - 14 4.3,4.8,5.3,6.0,6.2,8.1 Exhaust- Monster Exhaust, Single Passenger side exit, '10-11 Chevy-GMC 1500 Silverado 5.3L CCSB & ECSB, Gas-FFV User Manual
Page 4
4
96550 v.2.0
1.
Disconnect the negative (ground)
cable from the battery (if there is more
than one battery, disconnect both
negative cables). Secure the cable so
it cannot accidentally come in contact
with the post.
2.
Raise the vehicle and support it
securely with properly weight-rated
safety stands, ramps or a commercial
hoist. Take care to balance the vehicle
to prevent it from slipping or falling.
When using ramps, be sure the wheels
are centered squarely on the topsides.
Place the transmission in park
(automatic), set the parking brake and
securely block the wheels that are on
the ground.
CautioN: Do Not WoRK uNDER
aNY VEHiCLE SuPPoRtED oNLY
BY a JaCK. SEVERE iNJuRY MaY
RESuLt.
WaRNiNG! the following step
may require the use of a torch
and/or saw. Proper safety
equipment should be used.
Failure to use proper safety
equipment may result in severe
injury.
3.
Measure 10” from the rear braided
flex tube flange and mark the location.
See Figure 2.
4.
Take time when measuring and
cutting the factory intermediate pipe
to ensure the proper location and a
straight cut. Improper cut will result
in poor fitment of the Banks Monster
Exhaust system. Using a reciprocating
saw, cut the intermediate pipe.
5.
Remove the tailpipe hanger pin
from the rubber hanger. Remove
the rear muffler hanger pin(s) from
the rubber hanger(s). Remove the
Intermediate pipe hanger pin from the
rubber hanger.
NOTE: Spray lubricant may assist in
hanger pin removal. Rubber hangers
can also be removed from the vehicle
to assist in tailpipe / muffler removal.
6.
Remove the tailpipe, muffler and
intermediate pipe assembly from the
vehicle.
7.
Locate the supplied Banks
Intermediate pipe. Both ends of Banks
intermediate pipe are size differently
for different model applications. Fit
Monster Exhaust System installation
Figure 2 5.3L Model Factory Intermediate Pipe