Installation procedure – Banks Power Dodge Trucks: (Diesel ’98 - 02 5.9L Cummins ISB) Speed Control- Banks SmartLock (used with CBC-equipped Banks Brake) User Manual

Page 5

Advertising
background image

Figure 3

Figure 4

CAuTioN: installation of

the SmartLock Trans Brake

is NoT complete until

Functional Testing,

described on pg. 7 of

this manual, has been

successfully completed.

PNEumATiC LiNE

PRESSuRE BooST

ACTuAToR ASSEmBLY

iNSTALLATioN:

NOTE: The following

instructions assume that a

Banks Brake system has been

previously installed on the

vehicle.

1.

As a precaution,

disconnect the ground of the

battery. If there is more than

one battery, disconnect both.

2.

Raise and support the

vehicle.

3.

Disconnect the cable from

the kick-down lever on the

side of the transmission case

as shown in Figure 1.

4.

Disconnect the return

spring attached to the kick-

down lever as shown in

Figure 2. Save the spring for

reuse later.

5.

Loosen the tightening

screw and remove the OEM

kick-down lever as shown in

Figure 3.

6.

Remove the bolt shown

in Figure 4 from the

transmission case and install

the line pressure boost

actuator bracket as shown.

Temporarily finger-tighten the

bolt to allow adjustment.

7.

Slide the actuator control

lever over the throttle valve

shaft and tighten the bolt.

Re-attach the return spring

to the transmission case

Figure 1

Figure 2

installation Procedure

9 6 9 8 5 v . 7 . 0

| 5

Advertising