Exhaust system installation – Banks Power Ford Trucks: (Diesel ’03 - 07 6.0L Power Stroke) Exhaust- Monster Exhaust, Split-Dual '03-07 F250-F350 User Manual

Page 8

Advertising
background image

1.

Disconnect the negative (ground)

cable from the battery (if there is more

than one battery, disconnect both

negative cables). Secure the cable so

it cannot accidentally come in contact

with the post.

2.

Raise the vehicle and support it

securely with properly weight-rated

safety stands, ramps or a commercial

hoist. Take care to balance the vehicle

to prevent it from slipping or falling.

When using ramps, be sure the wheels

are centered squarely on the topsides.

Place the transmission in park

(automatic) or reverse (manual), set

the parking brake and securely block

the wheels that are on the ground.

CAUTION: DO NOT WORK UNDER

ANY VEHICLE SUPPORTED ONLY

BY A JACK. SEVERE INJURY MAY

RESULT.
WARNING! The following step may

require the use of a torch and/

or saw. Proper safety equipment

should be used. Failure to use

proper safety equipment may

result in severe injury.

3.

From under the vehicle, remove

the factory exhaust system from the

catalytic converter back. Starting

at the rear of the vehicle, remove

each component by either cutting

through the pipe near the clamps or

by removing the clamps and heating

the joints with an oxy-acetylene torch

to allow crimped pipes to separate.

DO NOT cUT OR DAMAGE cATALyTIc

cONVERTER TUBING DURING THE

REMOVAL PROcESS. Remove the

hanger pins from the rubber hangers

with a pry bar. (Spray lubricant will

ease hanger removal.)

4.

Remove the two (2) nuts attaching

the turbine outlet pipe (T.O.P.) to the

catalytic converter inlet. Loosen and

remove the band clamp that attaches

the rear intermediate pipe to the

catalytic converter outlet. Remove the

catalytic converter assembly from the

vehicle. Remove the band-clamp that

attaches the T.O.P. to the turbocharger

and remove the factory T.O.P. from

the vehicle. Retain V-band clamp for

re-assembly.
Note: To assist in T.O.P. removal,

remove the rear engine hoist hook by

removing the two (2) Hex screws and

remove the valve cover heatshield. The

dipstick tube may also be removed

or slightly bent to allow for T.O.P.

removal/installation. Removal may also

be made easier by cutting the T.O.P.

Retain all hardware and parts for

reassembly.
For Manual Transmissions only:
the

transmission will need to be lowered

to allow for removal and installation of

the T.O.P. Using a Transmission Jack,

support the rear of the transmission to

allow working room for the T.O.P. and

remove the rear transmission mount

and crossmember. Remove the Front

drive shaft support bracket from the

cab. Lower the transmission 4-6” and

remove the factory T.O.P. Install the

Banks T.O.P.
The transmission may need to be

raised before the Banks T.O.P. is

installed. Raise the transmission

and reinstall drive shaft bracket,

transmission crossmember and rear

transmission mount. Refer to vehicles

owners manual for factory Torque

Specifications.

5.

Loosely place the factory V-band

clamp on the Banks T.O.P. Install the

Banks T.O.P. to the turbine housing.

Snug the V-band clamp assuring the

T.O.P. is aligned properly, but do not

fully tighten at this time.
Note: Reinstall the engine hoist

hook and valve cover heat shield if

previously removed.

Exhaust System Installation

8

96445 v.5.0

Advertising