Transition instructions, Standard oval transition assembly – Grain Systems PNEG-838 User Manual

Page 3

Advertising
background image

PNEG-838

Page 3 of 4

Standard Oval Transition Assembly

Transition Instructions

1. Fold and lap opposite ends of housing wrapper. Using 1/4"-20 x 1/2" bolts, bolt the seams together

leaving the end two (2) holes open.

2. Rotate housing wrapper until bolted seam is on bottom. Slip housing through entrance collar until

front edge is flush with extruded lip.

Figure 4

3. Align holes designated “A” and bolt them first. Place center brace into position and bolt top and

bottom. Complete by bolting remaining holes and inserting remaining braces as shown in

Figure 5

.

Figure 5

4. Slide transition face collar into opening, with crimped surface at top. Secure with remaining bolts.

Figure 6

Advertising