Grain Systems Bin Accessories PNEG-268 User Manual

Assembly and installation instructions, Instructions, Auto-vent installation

Advertising
background image

Date: 06-02-08

PNEG-268

Instructions

1004 East Illinois Street • Assumption, IL 62510 • 217-226-4421

PNEG-268

Printed in the U.S.A.
Copyright © 2008 by GSI Group
www.gsiag.com

Page 1 of 2

Auto-Vent Installation

Assembly and Installation Instructions

The following instructions are for assembling and installing the auto-vent. First, check the packing list to
ensure all components have been shipped. The unit is easiest assembled in the upside down position
as shown in

Figure 1.

Roof vent location should be as shown in

Figure 5.

Assembly

1. Take all parts out of the shipping box and check if all parts are present.

2. Turn one (1) roof vent housing (MIS-6778) upside down.

(See Figure 1.)

3. Insert 5/16" x 1-1/4" bin bolt with neoprene washer through hole in the side of roof vent housing. Place

jamb nut onto the bolt and tighten.

(See Figure 1.)

4. Slide flap assembly (MIS-6777) onto bolt. The bolt should slide through hole in the flap assembly

bracket. Install with curvature cupped upward and the brackets in the position as shown.

5. Insert 5/16" x 1-1/4" bin bolt with neoprene washer through the other side of the roof vent, through

jamb nut and other flap assembly bracket. Tighten nut against vent housing side.

6. Apply a bead of tube caulking around three (3) housing sides of the roof vent where it meets the

hold down angle.

7. Place hold down angle (MIS-4404) on the assembled roof vent. The wide end of the hold down angle

must face vent discharge. Once aligned, screw nine (9) #10 self-drilling (S-280) screws through the
roof housing and into the hold down angle.

(See Figure 2

and Figure 3.)

Figure 1

Figure 2

Advertising
Table of contents