Installation, Chapter 4 installation, Prepare the powerhead – Grain Systems Unload Augers PNEG-1583 User Manual

Page 11

Advertising
background image

PNEG-1583 10" Commercial Replacement Drive Kit 11

4. Installation

Prepare the Powerhead

1. Disconnect and lock out all power to the 10'' commercial double-drive vertical unload auger.

2. After the power has been disconnected and locked out, remove the existing belt guard assembly

on the horizontal drive.

a. Open the existing belt guard.

b. Relieve tension on the drive belts by adjusting the motor mount assembly.

c. Remove the drive belts.

d. Remove the motor pulley and drive sheave.

e. Unbolt and remove the existing belt guard assembly.

3. Remove the horizontal drive motor from the powerhead.

4. After the motor has been removed, loosen and remove the 3/4'' hex nut underneath the motor

mount sides, holding down the motor mount assembly.

(See Figure 4A.)

Figure 4A

A main power disconnect switch capable of being locked only in the OFF
position should be used. The switch should be locked out whenever work is
being done on the powerhead.

Advertising