Grain Systems PNEG-924 User Manual

Page 2

Advertising
background image

Place Handle Assembly (F-7207) into the slots of the bracket. Cable and S-Hook should
be toward the center of the shutter (Figure 3).

3

4

Drill a 3/16” hole at the end of the linkage
bar as shown in Figure 4.

Figure 4

Cable Assembly

Drill 3/16” dia.
1/4” from edge.

S-Hook

Slide the Large Eyelet Terminal
(HH-1805) onto the end of the cable.

5

Attach the Cable Assembly (F-7208) to the
Linkage Bar of the shutter using the S-Hook
provided (Figure 4).

Feed the Cable through the hole at the cen-
ter of the frame that was located in Step 3.

6

7

DO NOT CRIMP

8

Prop the shutter vanes to the fully open position. Hook the
Eyelet over the S-Hook of the Handle Assembly.
Slide the cable throught the Eyelet until all slack is removed.
Mark and trim the cable to this point.
Crimp the Eyelet to the end of the new cable length.

9

Crimp S-Hook on the Handle Assembly to the Eyelet of the Cable Assembly.
Open and Close Shutters a few times using the Handle to check operation.
Adjust the Bracket so the Shutter is fully open when the Handle is placed in
the Bracket.

Advertising