PNEG-1089 Top Dry Duct Installation

5

2. Top Elbow Duct Section

Duct and Drying Fan Pad Optional

Placement of the duct fan pad: GSI Top Dry duct system only.

Refer to

Figure 2A

to determine the duct pad size. The top of this pad should be level with the top of the

bin’s foundation. Recommended pad thickness is 4" minimum. Front of pad should be perpendicular to
bin wall.