Dryer Pre-fire Checklist

___ Check wiring in control boxes (Jumpers, loose wires, and strands).
___

Check wiring to the main power supply.

___

Check location of 1FI and 2FI wires, make sure 1 is on L1 and 2 is on L3.

___

Capacitor is installed on moisture control light (2000 series only).

___

Check all overloads are set at the rated amperage listed on motors rating plate.

___

Check wiring in fan boxes

___

Check fan overloads are set at the rated amperage listed on the motors rating plate.

___

Check direction of flow on all solenoids and regulators.

___

Perform a Dielectric Strength (Hi-Pot) test in accordance with work instruction QSD-000152.R00. ___ Pass, ___ Fail

___

Perform a Grounding Continuity test in accordance with work instruction QSD-000151.R00. ___ Pass, ___ Fail

___

Apply required power.

___

Install newest version of software into the computer. Version #

_______

___

Check switch wiring using feature in program (Vision).

___

Check switch lights for correct colors.

___

Set dip switches on back of display I/O. 2 & 3 on for GSI, 2 on for FFI.

___

Put correct model number of dryer into computer.

___

Check LCD for backlighting.

___

Do all operating lights work?

___

Overload amp range: Load _______, Unload _______, Fan #1 _______, #2 _______, #3 _______, #4 _______, #5 _______, #6 _______.

___

Auxiliary overload amp range: Unload

_________ Load _________.

___

Check 12 volt output. _________ Volts.

___

Check that grain and plenum temperature read out is correct.

___

Check the SCR drive resistor for the proper size.

___

Check outside light.

___

Check motor rotation: Unload (CCW)

_________Load (CW) _________ Metering rolls (CW) _________ Load CCW for FF _________.

___

Ensure Aux contactor engages when load is on

___

Ensure Aux contactor engages when unload is on

___

Check Unload Auger for Excessive Vibration.

___

Metering roll RPM and BPH are displayed and counting.

___

Check 2 speed operation with moisture control on for low speed and off for high speed.

___

Turn pots on main I/O board fully to the right.

___

Set SCR board pots IR to 10 o’clock and CL to 4 o’clock.

___

Adjust minimum voltage for SCR drive to 9 volts @ 0 on pot display for vision set 9 volts @ 50 for (2000 series)

___

Adjust maximum voltage for SCR drive to 180 volts @ 1000 on pot display

___

Check for unload auger clean out time delay after SCR has shut off meter rolls.

___

Check load motor on and off operation with the mercury switch with delay.

___

Check the out of grain timer is working.

___

Check motor running amps: Unload

___________amps. Load _____________amps.

___

Run fans with airswitch on to make sure it is wired correctly.

___

Check the fan motor(s) running amps: Fan #1

_______ Fan #2 _______Fan #3 _______Fan #4 _______Fan #5 _______Fan #6 _______

___

Check total running amps of the dryer:

_______amps.

___

Is there a 5 second time delay between each fan start-up.

___

Check 20 second safety on burners with burner on but with no gas attached. #1

____ #2 ____ #3 ____ #4 ____ #5 ____ #6 _____


Dryer Burner Operation Checklist

___

Adjust the vaporizer coil (LP units only). Burner #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6______

___

Operate dryer in continuous flow mode.

___

Do all burners light: Burner #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6 ______

___

Adjust gas pressure

______ 3 & 10 lbs. for LP, ______ 2 & 6 lbs. for natural gas.

___

Check burner pipe trains for gas leaks: Burner #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6 ______

___

Do all burners cycle from high to low: Burner #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6 ______

___

Cycle burner six times by using the burner control switch

___

Cycle burner six times by setting the computer to on/off fire

___

Operate dryer in staged batch mode 2 times.

___

Does moisture control hold at the end of the dry cycle?

___

Video dryer with all motors and burners on.

___

Burn all gas out of pipe train.

Safety Shutdown Checklist

___

Housing high limit for fan #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6 ______

___

Vapor high limit for each fan (On LP units only) #1

______ #2 ______ #3 ______ #4 ______ #5 ______ #6 ______

___

Fixed grain high limits: Lower

____ Middle ____ Upper ____.

___

Check discharge switch with unload running to check discharge vibration and ensure proper shut down

___

Remove grain sensor wires to ensure proper wiring

___

Auxiliary user safety.

___

Plenum high limit for each plenum chamber.

___

Motor overload.

___

Make sure all covers are on boxes and housing high limits