General installation, Chapter 3 general installation, Installation instructions – Grain Systems PNEG-236 User Manual

Page 9

Advertising
background image

PNEG-236 Humidistat-Thermostat

9

3. General Installation

Figure 3A 24" is the approximate distance from the edge of the transition to the edge

of the humidistat installation.

Installation Instructions

Standard electrical safety practices and codes should be used when installing the Humidistat-
Thermostat. Refer to the National Electric Code Standard Handbook by the National Fire Protection
Association. A qualified electrician should make all wiring installations.

1. The Humidistat-Thermostat should be mounted on the side of the bin wall between the foundation

and the drying floor. It should be installed approximately 24" from the right side of the transition as
shown in

Figure 3A

.

2. Use the template

on Page 20

. With these instructions, drill only the holes necessary for the

particular model. (NOTE: For humidistat to operate properly optional cutout must be used.)

3. Caulk the top and sides of the plastic housing using roll caulking supplied with the unit. Do not caulk

the bottom side of housing so moisture can escape.

4. Carefully insert sensing probes through bin wall and secure housing to wall using self-drilling

screws provided. Be careful not to overtighten screws. Damage to housing could result.

5. Make wiring connections to heater as shown in heater Owner’s manual.

Always disconnect and lock out power before working on or around heater.

Advertising