Flashing installation, Grain systems formed flashing installation – Grain Systems Bin Flooring PNEG-225 User Manual
Page 19
Advertising

4. Monorail Installation
PNEG-225 Corrugated Floor and Monorail Layouts
19
Flashing Installation
Figure 4F
Grain Systems Formed Flashing Installation
If bin sweep auger is to be used, overlap flashing such that rotation (usually clockwise) of the sweep will
climb up on the next flashing section. This will prevent the rotating/slipping outer wheel of the sweep
from catching on the flashing edges.
After the floor is in place, lay the flashing pieces on top of the floor place over the 1-1/4" bin bolts.
to determine the correct sequence for placing the nuts and washers. Finger tighten the
nuts. While holding flashing flat, fasten the flashing to the floor with sheet metal screws. Now tighten
flashing nuts.
Figure 4G
Advertising