Check list – Grain Systems PNEG-269 User Manual

Page 2

Advertising
background image

2

Electric Heater

CHECK LIST

üOK
_____ 1. All wire connections
_____ 2. Fuse in place, extra fuse provided
_____ 3. Indicator lights
_____ 4. Unit cycles on to off with thermostat
_____ 5. Hi-coil or coils
_____ 6. Heat up
_____ 7. Lo-coil heats up

Tester Signature___________________________________

Date_________________________

This equipment shall be installed in accordance

with the current installation codes and applicable

regulations which should be carefully followed in

all cases. Authorities having jurisdiction should be

consulted before installations are made.

Advertising