Electronic HH-1089 Time Delay Reset Wiring Instructions

Use this page to install the HH-1089E as a replacement to the HH-1089 time delay reset switch in early
model heaters. Refer to

Figure 1 on Page 2

of the electronic time delay to identify the connection

terminals. Connect the wires according to the symbols used on

Figure 1 on Page 2

with the symbols in

the wiring schematics for the heaters.

Installation

1. Remove old time delay reset from the control box.

2. Install new time delay into existing hole in heater control box and secure with the nut provided.

3. Connect wire lead from the solenoid circuit to terminal #1 on the time delay. (Symbol A)

4. Connect wire lead from the flame probe to terminal #3 on the time delay. (Symbol B)

5. Connect wire lead from the housing High-Limit to terminal #4 on the time delay. (Symbol C)

6. Connect one end of the supplied wire for the neutral circuit (white with black stripe) to the “N” terminal

of the time delay. (Symbol D)

7. Connect the other end of the supplied wire for the neutral circuit to terminal #2 in the heater

control. (Symbol D)

Refer to the operating section

on Page 5

of this instruction sheet for reference to the time delay operation.