10° roof assembly instructions – Grain Systems Tanks PNEG-1923 User Manual
Page 4
Advertising
Page 4 of 7
PNEG-1923
10° Roof Assembly Instructions
Ladder Section Assembly
Two (2) splice plates are required to attach each additional ladder section. The head of the bolt should be
to the inside of the ladder with the splice plate on the outside as shown in
. Use 5/16" x 3/4" bolts
for all connections.
NOTE: With most installations, the last ladder section to reach the concrete will need to be cut to fit.
Figure 3
Advertising