6", 8" and 10" Truss Kit Assembly for 20' and 30' Spans

Assembly Instructions

(See Figures on Pages 3 and

4.)

Step 1: Place the truss mount in the center of the tube that is to be trussed. Fasten the truss mount

on the underside of tube using a plain 4" halfband and four (4) 3/8" x 1-1/2" long (grade 5)
hex head cap screws and nylon lock nuts.

Step 2: Connect the vertical truss sides to the right and left sides of the truss mount using a

1/2" x 1-1/2" long (grade 5) hex head cap screw and nylon lock nut for each truss side.

Step 3: Connect the truss crossbrace between the right and left truss sides using two (2)

3/8" x 1-1/4" long (grade 5) hex head cap screws and nylon lock nuts.

Step 4: Position the halfbands with the truss cable anchors the same distance from the truss mount

on opposite sides as close to the ends without interfering with other equipment. Attach the
halfbands with the truss cable anchors to the underside of the tube using a plain 6" wide
halfband and six (6) 3/8" x 1-1/2" long (grade 5) hex head cap screws and nylon lock nut per
each clamp.

NOTE: Truss cable anchors should be skip welded to the tube to prevent slipping.

Step 5: Install the eye bolts through ears located on the bottom of one of the halfbands. Make sure

the eye is pointing towards the truss assembly. Install one flat washer and two (2) non-lock
nuts onto the end of each eye bolt.

(See Figure 5 on Page 3.)

Step 6: Run cables through the cable anchor loops that are located on the bottom of one of the

halfbands. Fasten cables using two (2) cable clamps per each cable.

NOTE: Secure the U-bolt clamps against the loose end of the cable.

(See Figure 6 on Page 4.)

Step 7: Run the cables to the truss assembly and attach them to the truss sides using 3/8" cable

clamps.

(See Figure 4 on Page 3.)

DO NOT tighten 3/8" cables clamps down at this time.

Step 8: Loop cables through eyes in eye bolts and fasten together using two (2) cable clamps per

each cable.

NOTE: Secure the U-bolt clamps against the loose end of the cable.

(See Figure 5 on Page 3.)

Step 9: Using the eye bolts, tighten the cables to remove slack until cables are tight. Tighten both

cables so they have the same amount of tension. DO NOT overtighten. Sight down the tube
to make sure all sections are straight.

Step 10: Go back and tighten the 3/8" cable clamps that hold the cables to truss sides.