Scr drive setup, Chapter 3 scr drive setup, Scr board introduction – Grain Systems PNEG-1544 User Manual

Page 7

Advertising
background image

PNEG-1544 Vision SCR Board Calibration

7

3. SCR Drive Setup

Read these instructions before installation and operation of the equipment.

SCR Board Introduction

Calibrating the SCR Board requires access to the upper control box where the Main I/O Board and
SCR Board are located.

Figure 3A Main I/O Board and SCR Board Locations

To perform this procedure, the upper control box will need to be open with
electrical power applied. For this reason, a qualified electrician must perform the
SCR Board Calibration procedure.

Main I/O board

SCR Board

Advertising