24' roof rafter instructions – Grain Systems Bin Accessories PNEG-1805 User Manual

Page 2

Advertising
background image

Page 2 of 6

PNEG-1805

24' Roof Rafter and Temp Cable Assembly Instructions

24' Roof Rafter Instructions

Figure 2

NOTE:

1. After assembling the first ring of sidewall, the roof truss wall brackets can be bolted to the sidewall

with the top stiffener and eave clips.

2. The rafter attachment bracket and clip can be pre-assembled to the top end of the roof truss.

3. As roof panels are installed, place one roof truss in every third roof rib. Bolt truss at bottom to

wall bracket and at top to center collar. Refer to

Pages 3

and 4

for details.

4. For general roof installation, refer to 30° roof construction manual (PNEG-1092).

Advertising