Warning, Hc j – Peerless-AV PJF2-UNV-S - Installation User Manual

Page 4

Advertising
background image

ISSUED: 01-14-09 SHEET #: 056-9018-2 05-18-10

Visit the Peerless Web Site at www.peerlessmounts.com

4 of 9

For customer care call 1-800-729-0307 or 708-865-8870.

H

C

WOOD JOIST

Drill two 5/32" (4 mm) dia. holes to a minimum

depth of 2.5" (64 mm). Attach ceiling plate (

C)

with two #14 x 2.5" (6 mm x 65 mm) wood

screws (

H) as shown using 3/8" (10 mm) socket

wrench.
Skip to step 3 for flush mount installation.
Skip to step 4 for extension column

installation.

For Optional Cord Management,

install two spacers (

J) between ceiling

plate (

C) and ceiling.

Installation To Wood Joist Finished Ceilings,

Exposed Wood Joists, or Wood Beam Ceilings

WOOD JOIST

CEILINg

H

C

J

• Tighten wood screws (

H) so that ceiling plate (C) is

firmly attached, but do not overtighten. Overtighten-

ing can damage the screws, greatly reducing their

holding power.

• Never tighten in excess of 80 in • lb (9 N.M.).
• Make sure that mounting screws are anchored into

the center of the studs. The use of an "edge to edge"

stud finder is highly recommended.

WARNING

• It is the responsibility of the installer to verify that the

supporting surface will safely support the combined

load of all attached hardware and components.

WARNING

1

IMPORTANT: Be sure to drill holes into the

joist CENTER!

CEILINg

Advertising