Derale Performance 1_2" NPT Fluid Control Thermostat Kit User Manual

Diagram #2, Diagram #1

Advertising
background image

15719-InstructionSheet

Derale Performance, Los Angeles, CA

800.421.6288

www.derale.com

INSTALLATION INSTRUCTIONS

FLUID CONTROL THERMOSTAT

PART # 15719

KIT CONTENTS

QTY. DESCRIPTION

1

Fluid Control Thermostat - 1/2” NPT Ports

4

1/2” NPT x 1/2” Hose Barb Fitting

Please read these instructions completely before starting the installation.

The Fluid Control Thermostat can be mounted in any position.
Reference Diagram # 1 & 2 to insure the direction of oil flow is
correct.

Standard Screw Driver
Teflon Tape

Open End Wrench’s

TOOLS NEEDED

Warning: Installation of accessories should only be undertaken by those with mechanical knowledge and are familiar with working on

vehicles. Always use eye protection (goggles, safety glasses or shield). Park the vehicle in a well lit area, on level ground and apply the

parking brake. Only work on a cold vehicle that has been sitting overnight, failure to do so will result in severe burns and injury. Before starting

the vehicle, make sure no tools or any other items are left under hood that could interfere with or be drawn into moving parts of the engine.

Failure to follow instructions can lead to severe damage and personal injury.

Transmissions

Engines

RECOMMENDED FOR

How It Works:
When the oil is cool the valve is in the open
position, allowing oil to be applied equally to
both the inlet and outlet of the cooler,
preventing oil flow through the cooler. As the
oil temperature approaches 180ºF the valve
begins to close, forcing all of the oil to flow
through the cooler and return through the
valve to the source. This fail-safe design
insures full oil flow to the source regardless
of whether the valve is open or closed. The
cooler remains full of oil at all times,
eliminating pressure variations, aeration and
foaming of the oil.

FLUID CONTROL THERMOSTAT INSTALLATION

ROUTING HOSES

1. Install the

into the four ports using Teflon tape or sealer on the threads.

2. Choose where you want to interrupt both oil lines to install the Fluid Control Thermostat. Thermostat needs to be securely

fastened to the vehicle frame, fender well or other stationary location (Mounting Hardware Not Included).

3. Splice into the lines connecting the Engine / Transmission to the Oil Cooler. Following

connect the lines from

the Engine / Transmission and the Oil Cooler in the orientation shown above. Be sure the Hot lines are connected to the hot
side of the Fluid Control Thermostat and that the oil flows in the direction of the arrows.

4. Securely fasten all hoses before starting the vehicle.
5. Start the engine and check for leaks.

When routing hoses, be sure to keep all hoses away from sharp edges, moving parts and hot engine components.

Hoses should be routed carefully and should not be bent in less than a 5” radius.

A kinked hose will restrict flow and could cause failure.

Diagram #1

Warning:

Important:

1/2” NPT x 1/2” Hose Barb Fittings

IMPORTANT

Diagram #2

Diagram #2

made in

USA

Engine/

Transmission

Fluid Control

Thermostat

Oil Cooler

(Not Included)

Diagram #1

Diagram #1

AFTER COOLER

BEFORE COOLER

TYPICAL INSTALLATION

AFTER COOLER

BEFORE COOLER

made in

USA

made in

USA

1/2” NPT x 1/2”

Hose barb Fitting

Advertising