GE Industrial Solutions WattStation Pedestal EVSE Charger Operation and Maintenance User Manual
Page 38
Advertising
WattStation™ EV Charger User Manual
3388
GE Energy
©2012 GE Company All Rights Reserved
Topology #2: Cellular
In this configuration there is one Cellular router. The Cellular router is housed inside the
WattStation unit along with a small provided Ethernet switch.
Figure – 4.19
Topology #3: Cellular (Daisy Chained)
In this configuration there is one Cellular router. One WattStation unit is designated to house
this router. The Cellular router is connected internally to a small provided Ethernet switch. To
connect another WattStation it is necessary to connect one of the spare Ethernet switch ports
to the other unit’s internal Ethernet switch. Repeat this step for additional units.
Figure – 4.20
Advertising