GE Industrial Solutions MicroVersaTrip Plus and MicroVersaTrip PM AK-1-15, AK-1-25 User Manual

Page 7

Advertising
background image

7

6. To remove the phase barriers on each phase,

push the moving contact assembly and the

adjustment screw toward the rear of the breaker,

then pull the phase barrier up and to the front, as

shown in Figure 8.

7. Remove the retaining clip from the center

mounting post of each line and load draw-out

primary contact finger assembly, as shown in

Figure 9, then remove the fingers. Be sure to save

the existing flat washer from each assembly for

reuse, but discard the retaining clip.

8. Remove the four hex-head bolts securing the

pole assembly to the breaker, as shown in Figure

10. Tilt the pole assembly forward and lift

upward to remove it from the breaker. Be sure to

save all hardware.

CAUTION: The pole assembly is heavy and awk-

ward. Take care not to damage the assembly or the
breaker’s common trip shaft while removing the
pole assembly.

Figure 8. Removing the phase barriers.

Figure 9. Removing the draw-out primary contact fingers.

Figure 10. Removing the pole assembly.

Insulating

Strips

Insulating

Strips