SECTION 10—Checking and Installing Breakers

CAUTION: IF THE COMPARTMENT SECONDARY CON-
TROL CIRCUITS ARE ENERGIZED, THE FOLLOWING

PROCEDURE SHOULD BE FOLLOWED TO PREVENT
ARCING AND BURNING OF THE MOTOR CIRCUIT PINS IN

THE SECONDARY CONTACT BLOCKS: EITHER CHARGE THE

CLOSING SPRING MANUALLY, OR PUSH IN AND HOLD THE

MANUAL CLOSE BUTTON TO OPEN THE MOTOR CIRCUIT,

THEN PULL DOWN THE HANDLE AND EXTEND THE

BREAKER SECONDARY CONTROL CONTACT BLOCK TO
FIRMLY ENGAGE WITH ITS MATING SECONDARY CONTROL

CONTACT BLOCK IN THE COMPARTMENT. RELEASE
CLOSE BUTTON TO ACTIVATE SPRING CHARGING MOTOR.

Verify that spacing between the lower inside edges of the

breaker roller track in the metalclad compartment is 29.807”
min. to 29.857” max. Check that the breaker is OPEN and that

the closing spring is DISCHARGED. Install the PowerVac

®

circuit breaker into the DISCONNECT/TEST position in the

metalclad compartment.


CAUTION: IF CONTROL POWER IS AVAILABLE, CLOSE
THE CIRCUIT BREAKER USING THE CONTROL SWITCH ON
THE COMPARTMENT DOOR. THIS OPERATION WILL

CHECK THE ADJUSTMENT OF THE 52/LCS SWITCH. IF THE

BREAKER WILL NOT CLOSE ELECTRICALLY, RECHECK THE

52/LCS ADJUSTMENT. IF CONTROL POWER IS NOT AVAIL-

ABLE, PUSH THE MANUAL CLOSE BUTTON AND

RECHARGE THE CLOSING SPRING MANUALLY. SPRING
CHARGING WILL OCCUR AUTOMATICALLY IF CONTROL
POWER IS CONNECTED.

With the breaker in the CLOSED condition, attempt to install

the racking crank. The racking crank should be blocked by the
POSITIVE INTERLOCK. Trip the breaker and install the racking

crank and rack the breaker toward the connected position. The

spring discharge interlock will discharge the closing spring,

during the first five turns, usually between the third and fourth

if the closing spring is charged. The contacts of the circuit
breaker should remain open. (If adjustment is required see

MECHANICAL ADJUSTMENTS sections 16.7 and 16.8.) Rack

the breaker into the CONNECTED position and charge the

closing spring. If secondary control power is available the

closing spring will charge automatically. Assure that the

breaker is in the OPEN condition.

Rack the breaker from the CONNECTED back to the

DISCONNECT position. During the first three turns, the spring

discharge interlock should discharge the closing spring and

the breaker contacts should remain OPEN. (If adjustment is

required see MECHANICAL ADJUSTMENTS sections 16.7 and
16.8.)